Master plans for drinking water supply in 13 prefectural capitals
Country : Togo
Service : Drinking water and sanitation planning, modelling, phasing of capital expenditure and operating costs
Client : SP-EAU (Company for Water Supply and Sanitation in Urban and Semi-urban Areas)
Funder : French Development Agency
Duration : 2021 to 2023
Total amount : € 612 K
Partners : A-Z Consult, Seureca
The project
Drinking water works and investment programme for 13 prefectural capitals in Togo. Seeking energy-efficient solutions, protecting water resources, taking vulnerable populations into account, and ensuring the profitability and financial sustainability of operations.
Our services as part of the project
Definition of master plans for the 13 centres.
Activities conducted :
-
Preliminary studies: data collection, assessment of existing infrastructure, definition of the scope and timeframe of the study
- Analysis of water demand: analysis of past and current consumption, analysis of demographics and urban planning, household surveys, projections and estimates of future demand
- Resource analysis: conducting hydraulic gauging, modelling current water resources and their exposure to climate change, assessing future production requirements and the resources to be mobilised
- Analysis of the balance between water requirements and available resources
- Definition of solutions: requirements for the rehabilitation and construction of new water abstraction points, treatment works, supply networks, storage and distribution facilities
- Design, hydraulic modelling and cost estimation of the proposed solutions at the pre-feasibility stage
- Assessment of the environmental and social impacts of the proposed solutions.
- Organisation of investments: phasing of investments, funding requirements, impact on operating costs and tariffs, investment plan
Master plans for drinking water supply in 13 prefectural capitals
Country : Togo
Service : Drinking water and sanitation planning, modelling, phasing of capital expenditure and operating costs
Client : SP-EAU (Société de Patrimoine Eau Potable et Assainissement en milieu Urbain et semi-urbain)
Funder : French Development Agency
Duration : 2021 to 2023
Total amount : € 612 K
Partners : A-Z Consult, Seureca
The project
Drinking water works and investment programme for 13 prefectural capitals in Togo. Seeking energy-efficient solutions, protecting water resources, taking vulnerable populations into account, and ensuring the profitability and financial sustainability of operations.
Nos services dans le cadre du projet
Definition of master plans for the 13 centres.
Activities completed :
-
Preliminary studies: data collection, assessment of existing infrastructure, definition of the scope and timeframe of the study
- Analysis of water demand: analysis of past and current consumption, analysis of demographics and urban planning, household surveys, projections and estimates of future demand
- Resource analysis: conducting hydraulic gauging, modelling current water resources and their exposure to climate change, assessing future production requirements and the resources to be mobilised
- Analysis of the balance between water requirements and available resources
- Definition of solutions: requirements for the rehabilitation and construction of new water abstraction points, treatment works, supply networks, storage and distribution facilities
- Design, hydraulic modelling and cost estimation of the proposed solutions at the pre-feasibility stage
- Assessment of the environmental and social impacts of the proposed solutions.
- Organisation of investments: phasing of investments, funding requirements, impact on operating costs and tariffs, investment plan